Sourcing and procurement

See the goods before you pay the balance

Fixing a problem after the goods reach Baku is slow and expensive. Inspectors visit the factory in China, check the goods against an international sampling standard, and the balance waits until you have the report.

Overview

Once the goods have left China, putting a defect right is slow and expensive. The best moment to settle quality is before shipment, while the goods are still at the factory and the final payment has not been made.

We inspect against criteria agreed in advance: quantity, dimensions, materials, function, packaging and marking. Samples are drawn from the batch by the sampling method accepted in international practice. The report shows the findings with photographs and measurements and ends with a recommendation: release, rework or re-inspection.

Scope

What we do

  1. 01We build a checklist from your specification and the approved sample
  2. 02We pull random samples according to AQL
  3. 03Measurements, colour, material, function and safety tests
  4. 04We check packaging, labels and markings
  5. 05We supervise container loading: count, condition and seal
  6. 06Defects are classed as critical, major or minor, with a recommendation

Process

How the work runs and how long it takes

  1. 01

    Checklist

    1–2 days

    We agree what to check and the acceptable defect levels.

  2. 02

    Booking

    2–3 business days ahead

    The date is set with the factory; goods should be 80–100% finished and packed.

  3. 03

    Inspection

    1 day

    The inspector samples, measures and tests at the factory.

  4. 04

    Report

    24–48 hours

    Photos, measurement tables and a defect list.

  5. 05

    Decision

    your call

    If it passes, you pay the balance; if not, rework and re-inspection.

Fees

How the fee is made up

Inspection
Fixed fee per inspector-day
Travel
Extra for remote areas
Laboratory
At the laboratory’s rates
Re-inspection
Can be charged to the supplier in the contract

Questions

Questions clients ask

When should goods be inspected?

The most common is the pre-shipment inspection: when goods are 80–100% finished and packed, before the balance is paid. With a new supplier, a mid-production check also helps.

What is AQL?

It is a statistical sampling standard (ISO 2859-1) that sets how many units to check and how many defects are acceptable. You choose the defect limits.

What if the goods fail?

The supplier fixes the defects and the goods are re-inspected. Who pays for re-inspection should be written into the contract in advance.

Do you check container loading too?

Yes. We check the count and the condition of the packing, watch the loading and photograph the seal number.

Let us talk about your plans

A few lines about the project, the industry and your timing are enough. We reply within one business day with the steps, the timetable and a written proposal.

Write to us
WhatsAppWeChatTelegramEmail